Ballsbridge, Dublin 4
Builders in Ballsbridge
Restoration, renovation and extension of Ballsbridge’s large period houses, from the red-brick terraces to the detached villas on the embassy roads.
At a glance A typical project here: a full renovation of a 300 m² period house with a 30 m² rear extension, luxury finish. Budget about €428,000 to €614,000 + VAT, with fees and contingency.
€428k–€614ktypical project + VAT, all in
Needs permissionProtected structures
Dublin Cityplanning authority
Freesite visit and itemised estimate
The houses
What we usually build in Ballsbridge
Large detached and semi-detached period houses
Some of Dublin’s grandest houses. Projects are usually a full renovation with new services, careful repair of the original fabric and a contemporary rear extension.
Red-brick terraces
Victorian and Edwardian terraces where a rear extension opens up the kitchen and the return is often rebuilt.
Protected structures
Many houses here are protected. Windows, plasterwork, floors and stairs need specialist repair, and most changes need permission.
Planning in Ballsbridge
Exempt, or does it need permission?
Planning in Ballsbridge is decided by Dublin City Council. With so many protected structures and conservation areas, expect to apply for permission for most external changes.
Needs permission
Protected structures
Any work that affects the character of a protected structure, inside or out, needs permission.
Check first
Single-storey rear, up to 45 m²
Exempt in principle, but not on a protected structure, and in a conservation area only if it doesn’t affect the character of the area.
Check first
Basements
Excavating a basement under a period house always needs planning permission and an engineer’s assessment of the neighbours’ walls.
The details are in our planning permission page.
Costs
What a typical Ballsbridge project costs
The typical project above costs about €428,000 to €614,000 + VAT. That includes design and engineering fees, and a contingency for what can’t be seen before work starts.
Your house will be different, so put your own sizes into the price calculator or see our prices.
Questions
Building in Ballsbridge: your questions
Can you work on a protected structure?
Yes. We work with conservation architects and use traditional methods where the house needs them: lime mortar, repairing original sash windows and plasterwork, and breathable insulation.
How long does a large Ballsbridge renovation take?
A full renovation of a large period house typically takes 9 to 14 months on site, after planning permission.
We also work in Donnybrook · Rathgar and across Dublin 4.
Planning work on a Ballsbridge house?
We’ll look at the house with you and tell you what’s possible, what it should cost and whether it needs planning permission.