Mount Merrion, Co. Dublin

Builders in Mount Merrion

Extensions and renovations for Mount Merrion’s 1930s to 1950s houses on generous plots between Deerpark and the N11, many of which have already been extended once.

At a glance A typical project here: a 35 m² wrap-around extension and full renovation of a 170 m² 1940s semi-detached house, mid-range finish. Budget about €229,000 to €313,000 + VAT, with fees and contingency.

€229k–€313ktypical project + VAT, all in

Usually exemptSingle-storey rear, within what’s left of 45 m²

Dún Laoghaire-Rathdownplanning authority

Freesite visit and itemised estimate

The houses

What we usually build in Mount Merrion

1930s to 1950s semi-detached houses

Well proportioned with long gardens. The classic project is a rear kitchen-living extension plus a full renovation of the original rooms.

Detached houses

Larger houses suited to wrap-around extensions, first-floor bedroom suites and deep energy upgrades.

Houses already extended

Many have an older side or rear extension. Earlier extensions count towards the 45 m² exemption, which often decides whether you need permission.

Planning in Mount Merrion

Exempt, or does it need permission?

Planning in Mount Merrion is decided by Dún Laoghaire-Rathdown County Council. Because so many houses have been extended before, the 45 m² allowance is often partly used up.

Usually exempt

Single-storey rear, within what’s left of 45 m²

Every extension since 1964 counts, including one built by a previous owner.

Check first

Replacing an older extension

Demolishing and rebuilding still counts towards the total. We measure what’s there first.

Needs permission

Two-storey side extensions

Common here, and always need permission.

The details are in our planning guide for Dún Laoghaire-Rathdown.

Costs

What a typical Mount Merrion project costs

The typical project above costs about €229,000 to €313,000 + VAT. That includes design and engineering fees, and a contingency for what can’t be seen before work starts.

Your house will be different, so put your own sizes into the price calculator or see our prices.

Questions

Building in Mount Merrion: your questions

My house was extended in the 1990s. Can I extend again without permission?

Possibly, but the old extension counts towards the 45 m² limit. If it was 20 m², you have 25 m² left. A Section 5 declaration from the council (€80) confirms it. See our planning guide.

Can you replace a small side extension with a two-storey one?

Yes, with planning permission. We design it with our architect to meet DLR’s requirements on boundaries, light and overlooking.

How long would an extension and renovation take?

Usually 20 to 26 weeks on site for both, and longer if planning permission is needed first.

We also work in Blackrock · Dundrum and Churchtown · Foxrock and across South County Dublin.

Planning work on a Mount Merrion house?

We’ll look at the house with you and tell you what’s possible, what it should cost and whether it needs planning permission.

Call Free consultation