How to choose a builder in Dublin: 12 checks before you sign

At a glance Check the builder is a real, registered company with work you can see. Look them up on the CRO, ask for their insurance certificate and tax clearance, visit a finished job and talk to past clients. Then compare itemised estimates, not totals, and agree the payments in writing, matched to the work.

12checks before you sign

CROcheck the company

3itemised estimates to compare

In writingthe payment schedule, before you sign

Is the company real?

  1. Look them up on the CRO. The Companies Registration Office shows when the company was registered and who the directors are. A firm claiming hundreds of projects but registered last year deserves questions.
  2. Check who actually builds. Some websites collect enquiries and pass them to whoever is available. Ask who will run your site, and meet them.
  3. Ask for the insurance certificate. Public liability and employer’s liability, with the insurer named and the dates current.
  4. Ask for tax clearance. Revenue issues a tax clearance access number you can verify online. It’s also needed for most grants.
  5. Check trade registrations. Electricians should be registered with Safe Electric, gas installers with RGII. Ask which trades are in-house.

Can they show the work?

  1. Ask to see a finished job like yours, ideally nearby. A builder with real projects can arrange a visit or a call with the owner.
  2. Read reviews about projects, not small jobs. Ten reviews for painting or flat-pack assembly say little about a €200,000 renovation.
  3. Check the paperwork from a past job. Ask what you’ll get at handover: engineer’s certificate of compliance, electrical and gas certificates, BER.

Is the estimate complete?

  1. Get an itemised estimate, not one line. It should list each part of the work, the specification and what’s excluded.
  2. Check the provisional sums. These are allowances for things not yet chosen, like the kitchen, tiles or sanitaryware. An estimate with low provisional sums looks cheaper but rises later.
  3. Agree the payments in writing. A deposit to secure the start date, a fee when work starts on site, then smaller payments as the work progresses. No payment should run far ahead of the work. Be wary of large upfront payments or cash-only deals.
  4. Get a written contract and programme. Start date, duration, how changes are priced and agreed, and who handles planning and building control.

Red flags

  • Pressure to sign or pay quickly.
  • No fixed address, or only a mobile number and WhatsApp.
  • Big claims (“700+ projects”) that the company’s age or reviews don’t support.
  • Reluctance to put insurance, tax and the price in writing.
  • An estimate far below the others, with thin detail.

What we show you

Our company, VAT and insurance details are in the footer of every page. Every project on this site is ours, with its area, size, time on site and budget band. See our projects or about us, and ask to visit a job near you.

Questions

How many estimates should I get?

Three is usual for a large project. Give every builder the same drawings and specification so the estimates can be compared line by line.

What deposit is normal?

A deposit to secure the start date, then a fee when work starts on site and smaller payments as the work goes on. Avoid paying for large amounts of work in advance.

Should the builder or an architect manage the project?

Either works. With design-and-build, one company is responsible for design and construction. With an architect-led project, the architect designs, tenders and inspects. Ask who carries responsibility if something goes wrong.