Extensions · Where on the house

Wrap-around extensions in Dublin

Rear and side together, for one large L-shaped kitchen, dining and living space. More steel, more glazing and more value, usually on semi-detached and detached houses.

At a glance A wrap-around extension costs about €2,000 to €2,350 per m² + VAT to build in timber frame. A 40 m² one on a detached house comes to about €102,000 – €126,000 + VAT, all in. Because it goes round the side, it needs planning permission.

€2,000 – €2,350build per m², standard spec, + VAT

€102,000 – €126,000typical total + VAT, all in

16–24 weeks, plus planningtime on site

Needs permission (side part)planning

Is it right for you?

When a wrap-around extension makes sense

You want one big open-plan room

Kitchen, dining and living in one L-shaped space, with light from two sides.

You have a side passage and a garden

A wrap-around uses both, without taking too much of the garden.

You’re renovating the whole ground floor

It’s usually part of a bigger reconfiguration of the house.

Planning

Do you need permission?

Needs permission

The side part

Needs planning permission, so the whole wrap-around goes in one application.

Check first

Corner glazing

Large corner glazing needs steel designed for it, and can affect neighbours’ privacy.

Check first

Roof shape

Flat roofs with rooflights are common; pitched roofs need care where the two parts meet.

More on planning permission.

What to plan for

  • The corner where side and rear meet carries a lot of load; it’s designed by a structural engineer.
  • Where you place the kitchen decides the drainage route, so it’s fixed early.
  • Light from two sides makes a big room feel bright all day.
  • Heating and ventilation need planning so a large glazed room stays comfortable.

Your own figures: the cost calculator or our price list.

Questions

Wrap-Around Extensions: your questions

Is a wrap-around worth the extra cost?

If you want one large open-plan room and have a side passage, usually yes: it adds a lot of usable space without taking much more garden.

Does a wrap-around need planning permission?

Yes, because the side part isn’t covered by the exemption.

How long does it take?

Allow 12 to 16 weeks for planning, then 16 to 24 weeks on site.

Other options

Explore other types of extension

Where on the house

→
→
→

How many storeys

→
→
→

What it's for

→
→
→

How it's built

→
→

How big

→
→

Pick one in each row to see whether you need planning permission.

Thinking about a wrap-around extension?

Book a free consultation and get a clear answer on design, planning and cost.

Call Free consultation