Rear and side together, for one large L-shaped kitchen, dining and living space. More steel, more glazing and more value, usually on semi-detached and detached houses.
At a glance A wrap-around extension costs about €2,000 to €2,350 per m² + VAT to build in timber frame. A 40 m² one on a detached house comes to about €102,000 – €126,000 + VAT, all in. Because it goes round the side, it needs planning permission.
€2,000 – €2,350build per m², standard spec, + VAT
€102,000 – €126,000typical total + VAT, all in
16–24 weeks, plus planningtime on site
Needs permission (side part)planning
Is it right for you?
When a wrap-around extension makes sense
You want one big open-plan room
Kitchen, dining and living in one L-shaped space, with light from two sides.
You have a side passage and a garden
A wrap-around uses both, without taking too much of the garden.
You’re renovating the whole ground floor
It’s usually part of a bigger reconfiguration of the house.
Planning
Do you need permission?
Needs permission
The side part
Needs planning permission, so the whole wrap-around goes in one application.
Check first
Corner glazing
Large corner glazing needs steel designed for it, and can affect neighbours’ privacy.
Check first
Roof shape
Flat roofs with rooflights are common; pitched roofs need care where the two parts meet.
More on planning permission.
What to plan for
- The corner where side and rear meet carries a lot of load; it’s designed by a structural engineer.
- Where you place the kitchen decides the drainage route, so it’s fixed early.
- Light from two sides makes a big room feel bright all day.
- Heating and ventilation need planning so a large glazed room stays comfortable.
Your own figures: the cost calculator or our price list.
Projects
Recent extensions
Dublin 24
House extension Open-plan rear extension and ground-floor renovation, Firhouse
Firhouse, D24 · 13 weeks
Dublin 9
Home renovation, House extension Kitchen extension and ground-floor renovation of a Victorian terrace, Drumcondra
Drumcondra, D9
Dublin 15
Home renovation, House extension Timber frame extension with open-plan living and new kitchen, Blanchardstown
Blanchardstown, D15
Questions
Wrap-Around Extensions: your questions
Is a wrap-around worth the extra cost?
If you want one large open-plan room and have a side passage, usually yes: it adds a lot of usable space without taking much more garden.
Does a wrap-around need planning permission?
Yes, because the side part isn’t covered by the exemption.
How long does it take?
Allow 12 to 16 weeks for planning, then 16 to 24 weeks on site.
Thinking about a wrap-around extension?
Book a free consultation and get a clear answer on design, planning and cost.